01The need

Why school toilets fail

In many residential schools and welfare hostels a small number of toilets serve a large number of students, often with irregular water supply and limited cleaning staff. Our ground surveys repeatedly record the same pattern: blocked or broken pans, stained floors, missing doors or latches, no light, no soap and no running water near the toilet. When toilets are unusable, students — especially girls — avoid drinking water, stay away from class, or use open spaces.

Smart sanitation is not a gadget. It is a combination of better fixtures, automatic cleaning, reliable water, safe electrics and a maintenance routine that keeps a washroom usable every day of the year.

02What it includes

The concept

The CDECT smart-sanitation concept, shown in our illustrative visuals, combines:

  • Door-activated self-cleaning cover — the cover opens when a student enters and closes after they leave.
  • Automatic rinse and spray cycle — a short, metered rinse of the pan runs only after the cubicle is vacated.
  • Concealed floor-cleaning pipes — low-level nozzles wash the floor towards the drain on a schedule, followed by drying airflow where feasible.
  • Occupancy and door sensors — used only to know whether the cubicle is in use. No cameras or image sensors are ever used inside toilets.
  • Water-efficient fixtures — dual-flush or metered cisterns, and greywater reuse from handwash basins for flushing where the plumbing allows.

03Safeguards

Safety requirements we design to

Every proposal is reviewed for child safety before it reaches a school. The non-negotiable rules are:

  • No cleaning cycle while occupied. Spray, rinse and floor-wash cycles are interlocked with the occupancy and door sensors and cannot run while a student is inside. A manual stop is provided for caretakers.
  • Electrical safety first. Sensors and actuators run on low-voltage DC supplies; mains equipment sits outside the wet zone in sealed enclosures. Circuits are protected by a 30 mA residual-current device (RCD/RCCB), properly earthed, and installed and certified by a licensed electrician.
  • Water-rated components. Enclosures in wet areas are rated for water jets (IP65 or better), and wiring runs in sealed conduit away from the floor.
  • Fail-safe behaviour. If power or a sensor fails, the toilet remains a normal, usable toilet with a manual flush; doors can always be opened from inside and outside by staff.
  • Safe cleaning agents. Only mild, approved cleaning solutions are dosed, from locked reservoirs that students cannot reach. No acids or strong chemicals are sprayed automatically.
  • Slip resistance and drainage. Anti-skid tiles, correct floor gradients towards the drain and drying time between floor-wash cycles.
  • Privacy and dignity. Full-height doors with working latches, separate blocks for girls and boys, lighting inside and outside the block, and accessible cubicles for children with special needs.

04Sustaining it

Water, drainage and maintenance

Automatic systems are only as good as the water and drainage behind them. Each site assessment checks water source and storage, pressure, overhead tank capacity, existing drainage and septic or sewer connection. Where water is scarce, the design prioritises water-efficient fixtures and greywater reuse over additional automation.

A maintenance plan is part of every proposal: a trained caretaker, a daily checklist, a log of faults, a stock of consumables and a defined response time for repairs. See School Personnel & Service Support.

05How it works

How a school is selected

  1. A ground survey records the toilets, urinals, water supply and the number of students using them.
  2. Sites with the greatest need and a workable water and drainage situation are shortlisted.
  3. A Detailed Project Report (DPR) sets out technical specifications, implementation steps, maintenance, monitoring and timeline.
  4. Work begins only after approval by the competent authority and confirmed funding.
  5. Usage, cleanliness and faults are monitored after handover and reported to the department and funders.

06Status

Current status

The first pilot was approved in principle by the A.P. Social Welfare Residential Educational Institutions Society (APSWREIS) on 11-03-2026 at Dr. B.R. Ambedkar Gurukulam, Adavithakkellapadu (Guntur district), without financial burden to the Government and subject to a DPR. Site preparation has begun. Any wider roll-out will follow evaluation of this pilot. See Projects & Impact.

Want to support this programme? Partner with us on a specific school, or contribute to the programme of your choice.